About Me
MARC
My Qualifications
Year(s)
-
Subject(s)
Electrical Engineering
Year(s)
-
Subject(s)
Mechanical Engineering
Year(s)
-
Subject(s)
O Levels
Year(s)
-
Subject(s)
Fire fighting
My Skills
- Planned Preventive Maintenance ( PPM ) Programmable Logic Controllers ( PLCs ) Single-phase And three-phase electrical machinery Switchgear servo drives Inverters Circuit protection Motors Pumps Compressors Auto-lubes Separators Regulators Burket valves Pneumatics Electronics Pcb repairs Hydraulics Lighting Chemical dosing Effluent control systems Drive systems Clutches Gearboxes Monorail systems flow wrappers check weighers conveyor systems Palletising robots Pick And place robots Auto pallet wrappers Sterile wrappers Check weighers x-ray modules Metal detectors Monorail systems Steam tunnels Steam cabinets Autoclaves Sterile airlock labs Pressure equalising labsincludes Compressors
- pinch valves
- switch gear
- Silo
- s
- conveyors
- Seiffer mills
- Hoists
- A.H.U
- s
- trace heating
- hydraulics
- Pneumatic control equipment
- mixers
- agitators
- All of lighting circuits
- ( inc E- lighting test schedules )
- Laboratory test equipment
- fire alarm test schedules. All of production is controlled via a Scada system which is directly monitored by engineers in collaboration with production management
- to pre-empt any potential malfunctions. JUNE 2013 - OCT 2013 CONTRACT ELECTROMECHANICAL ENGINEER Ferguson Engineering North LADY FINE BAKERY LOCATION : NEWTON HEATH REASON FOR LEAVING : END OF CONTRACT To be part of an 8 man team who install from drawings all equipment used in industrial bread baking
- ( equipment produces 8 thousand loaves an hour ) .includes Robots
- conveyors
- Provers
- coolers
- ovens
- control cabinets
- Silo
- s
- mixers etc. Typical project lengths approx 3 months from start to finish. Working hours are typically 11 hours a day 7 days a week
- followed by one weekend off every 3 weeks. DEC 2012 MAY 2013 CHIEF ENGINEER BRITANNIA LAUNDRY
- STOCKPORT MANCHESTER REASON FOR LEAVING : RESIGNED DUE to BREACHES OF H/SAFETY REGULATIONS To immediately assess all machineries safety
- And secure all panels. Organise with immediate effect S.S.O.W for all machinery. Organise correct usage of P.P.E And regulation approved red boiler suits for improved visibility. To organise an industrial laundrys maintenance team.and organise shift patterns. To organise a spare parts department And a automated part re-ordering system. To organise daily And weekly safety check schedules for all machines. To personally inspect And assess all equipment
- prepare record logs
- implicate maintenance schedules. Coordinate And lias with management to achieve daily And weekly targets related to machine efficiency. To draw up customised P.P.M schedules on all machines to original manufacturers specification. Planning future improvements throughout all production lines. Control And manage water usage along with steam. Monitor electricity usage throughout both factorys And implicate energy saving systems wherever possible. JULY 2012 NOV 2012 PLANT MAINTAINANCE ENGINEER FREDERICKS DAIRY ( ICE CREAM PRODUCERS ) F.M.C.G LOCATION ; LIVERPOOL As plant maintenance engineer I was responsible for the following equipments reliability and efficiency : Air handling equipment And all extractors Extruders Conveyors Gearboxes Refrigeration ( inc ammonia systems ) Control panels PLC
- S Inverters Trace heating ststems Homogenisers Pasteurisers Motors ( single And 3 phase ) Pumps Compressors ( And auto lube systems ) Chillers All lighting ( inc monthly E-lighting test schedules ) Roof gantry lighting And light sensor circuits PPM schedules on all shop floor equipment Single phase And 3 phase wiring modification NOV 2011 - 2012 INDEPENDANT INDUSTRIAL ENGINEER LOCATION : ESSEX AND HOME COUNTIES Feb 2008 -Sept 2011 INDUSTRIAL LAUNDRY ENGINEER SUNLIGHT TEXTILE SERVICES LOCATION; BASILDON ESSEX As the senior electrical engineer reporting directly to the Chief Engineer I was part of a team responsible for maintaining throughput in a 24/7 NHS operation - duties included : Reactive repair
- under pressure
- in minimum time. 24-hour callout for electromechanical breakdowns. Overseeing rollout of proactive PPM procedures to minimise downtime. Rewriting manufacturer service procedures to maximise efficiency. Integrating PPM activity into the production schedule. Water effluent And recycle systems Sole responsibility for site lighting. Specific experience with : 3-Phase And single-phase motors And control gear. PLC programming And sequential control. Photocells And proximity switches. Hydraulics pneumatics And pumps. Seals
- traps And valves. Water softeners. Jan 2007 - Feb 2008 Head Maintenance Engineer Ninefields Injection Moulding : As Head Maintenance Engineer I lead a team of 3 engineers responsible for repair And maintenance in an injection moulding plant which ran 24/6 producing parts for prestige automotive clients including Aston Martin - duties included. Expansion of PPM program resulting in reduced downtime. Upgrading of hydraulic presses to increase service intervals. Legionella prevention And monitoring for cooling towers. CNC machinery in tool making workshop. Specific experience with : PLC controlled industrial robots. CNC lathes And milling machines. Spark eroders. Compressors. Conveyers. May 2004 - Jan 2007 Maintenance Engineer - Regis Furniture : I was part of a team of 12 maintenance engineers for a high volume furniture manufacturer running 24/5 with 4 engineers per shift - duties included : Electromechanical specialist. Instigated stocking of low value and/or high turnover spares to reduce downtime. Board level repair of control PCBs resulting in cost savings And reduced downtime. Factory lighting. Specific experience with : Wood cutting And finishing equipment. Routers
- grinders And boring machines. Sheet metal folders. April 2002 - May 2004 Laundry Engineer - Coldingly Laundry : I was part of a team of 3 maintenance engineers for an industrial laundry - duties included : All aspects of industrial laundry equipment. Repair And preventive maintenance. Design And implementation of an automatic cleansing system for machine photocells using waste air thus eliminating the need for manual cleaning
- which enhanced site safety And reduced downtime - the system is still in operation today. Specific experience with : 3-phase motors And control gear. Pumps
- steam traps
- valves. Pneumatics
- air operated clutches
- bearings June 86 - Oct 2001 Photocopier Engineer - Canon
- IBM
- Xerox Minolta
- Etc : On site repair And maintenance of analogue And digital photocopiers for various clients including the BBC
- Fox Entertainment
- Sothebys And high security sites such as banks And bullion vaults duties included : Customer liaison. Achieving optimum copy quality. Maximising the number of copies between call-outs - I was in the top 5% of performance benchmarking. May 84 - March 86 Special Effects Technician - Live Wire UK : Part of a team of 4 engineers installing bespoke equipment for the entertainment industry duties included : Installation of custom designed sound And lighting systems. Refurbishment And upgrading of existing effects systems. Adapting plans in light of installation problems. Prolonged periods of on site work. Jul 80 - June 83 Apprentice Electrical Engineer - Ultra Electronics ( Aviation ) : Part of the production engineering team for a military avionics company supplying parts for the Harrier jump jet program - duties included : Wiring looms designed to impede reverse engineering. Flow soldering of PCBs for avionics modules.
14290 views